RFR Solutions delivers Stainless Steel Liner to ESS in Lund

2018-03-19

The delivery consists of 6 enclosures, the largest being 6.5 meters long, 5.5 meters wide and 3.6 meters tall.
The enclosures will be loaded in Landskrona on 20 March and will be unloaded the following day at site in Brunnshög.


The transport from Landskrona to Lund takes place by special tonnage with accompanying cars and requires permission from the Swedish Transport Administration.
After the enclosures have been released at ESS, RFR Solutions undertakes the installation work on site.